APO Interview Questions Answers

SAP Functioal Modules ==> Advanced Planner Optimizer

How can a planning version be frozen and unfrozen? 

A Planning Version can be frozen and unfrozen using Function Module /SAPAPO/TS_PAREA_VERSIO_FREEZE so that no further changes to the planning version can be done. 

What is Release Profile? 

Release Profile is used to release timeseries data from DP to SNP/PPDS. You need to define the DP Planning Area and timeseries keyfigure the data in which is released and the SNP Category Type (typically FA) to which data is released. You may maintain a Daily Buckets Profile it will define the number of working days (working days determined based on Shipping Calendar maintained for the location master) starting on and from the From Date if released online/ interactively or that many workdays of the planning horizon when release is carried out in background. The Period Split (blank, 1 and 2) field in the SNP2 tab of location-product master determines how demand plan is released to SNP from DP (how bucketed data is disaggregated to the workdays). 

What is the usage of Period Factor? 

Period Factor maintained in the SNP PPM or Transportation Lane determines the Availability Date of a Receipt element within a time bucket (period). The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of the period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars. 
Period Factor used is .71 = 7x0.71 = 4.97 or 5 days from ptimizer of weekly bucket resulting in a Friday. 
If Period Factor is not maintained in PPM or Transportation Lane then the User Period Factor indicator and the Period Factor value maintained in the Lot Size tab of the location-product combination is used. If this is not maintained a default value of 0.5 is used. 

What determines stock categories displayed in Stock on Hand keyfigure? 

The categories defined in Category Group ST1 (can be maintained in table /SAPAPO/APOCGC) determine the stock categories that are displayed in the Initial bucket in the Stock on Hand keyfigure. Subsequent buckets are dynamically computed. 

Does dynamic alerts show up in Alert Monitor? 

Dynamic Alerts do not show up in the stand-alone alert monitor. Network alerts are to show pegging relationships. 

What is the report to execute MASSD? 

The report for executing MassD in background job is MASSBACK. 

What is the shortcut to change location type in APO? 

Report /SAPAPO/CHECK_LOCATION_TYPE can be used to change location type (say from 1001 to 1002 or vice-versa) of existing locations in APO. The table to refer is /SAPAPO/LOCMAP. SAP does not recommend this process.

Remark: Can you check if this works - cos I think you need to use/SAPAPO/CHANGE_LOCTYPE

How can a transaction be executed even when no authorization?

SE93 - Transaction code for Transaction Code E.g. CRC1 Create Resource has txn code CRAH. So if you do not have authorization to create resource you can use SE93 and enter txn CRAH and then Test F8 button to go to the txn. 

How to copy a Process Chain? 

To copy a process chain to another process chain, goto the Process Chain you want to copy and then type copy in the tool tar and hit enter. It will allow you to copy the Process Chain to another Process Chain that can be modified as per user's requirement, saved, activated and used. 

Remark: To copy a process chain to another process chain, goto the Process Chain you want to copy and then type copy in the tool tar also... if you dropdown on the toolbad under process chain you have a copy option... but this looks cool :)

What is the process to copy planning versions in R/3? 

Use OLIX to first delete previous MRP planning versions. Then use MCB& to create the new MRP planning versions by choosing the appropriate version you want to create as ICO Version. The info structure in this case is S094. 

How to use create planning book with two tables? 

To use two tables on one screen of Planning Book/Data View - select indicator next to second page title and give name. Additional tab page is displayed in Planning Book Maintenance wizard to define the keyfigures for the second table. 

Self Test Question

The following modules are available in SAP R/3 for a Professional User:

a.  Advanced Planner and Optimizer.
b.  Strategic Enterprise Management (SEM).
c.  Information Warehouse (BIW).
d.  SAP Net.
e.  Business-to-Business Procurement (B2B).

---

Correct Answer
a, b

SAP APO

See Also
APO Newly Designed Process In Comparison With R/3

Get help for your SAP APO problems
SAP APO Forum - Do you have a SAP APO Question?

SAP Books
SAP APO Books  - Certification, Interview Questions and Configuration

SAP APO Tips
SAP APO Tips and SAP Advanced Planner/Optimizer Discussion Forum

Main Index
SAP ERP Modules, Basis, ABAP and Other IMG Stuff

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.