We are facing a typical situation in CTM planning run, where there are daily orders generated as per resource capacity. Let me explain the situation with example : CTM orders generated as : Date Order # Qty
However we need to have one planned order of Total qty = 1440 i.e. (480+480+480) With Start date : 01.10.2009 and End date 03.10.2009 This planned order will go to R/3 and released as process order. Is there any CTM setting wherein we can consolidate the CTM daily orders into one planned order ? Solution: Aggregation in Capable-to-Match (CTM) takes place in two process steps: The first step is the aggregation itself and the second step is the actual planning of the aggregated demands and receipts. You can carry out aggregation based on a location product hierarchy and resource hierarchy and also use a hierarchy for production process models (PPMs) or production data structures (PDSs). You have specified at least one valid hierarchy in the CTM profile on the Aggregation tab page or have set the Use Hierarchies from Planning Area indicator. You have selected the header level as planning level. After aggregation, you can carry out time-based aggregation at header level. During time-based aggregation, CTM combines for each header location product the demands or receipts of specific ATP categories to one single demand or one single receipt. CTM groups these demands or receipts for each period. To determine the periods based on the time stream, CTM uses the time zone of the location. PS: After maintaining the hierarchy, and attaching it to planning area, and taking CTM run with aggregated product, results are seen in simulation run, but not yet in planning book.
Get help for your SAP APO problems
SAP Books
SAP APO Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|