What are the steps or transactions we need to carry out in the planning cycle? Assuming it's a weekly planning process. First release forecast from DP to SNP. After Heuristic and before Deployment what actions we need to take in APO & R3 1. Level the planned production orders 2. After Deployment and Before TLB what actions the planner need to take in APO & R3 1. 2. After TLB what steps are required in APO & R3 1. Ans 1: Assuming all the configuration and master data settings are done. The following would be the routine things: After Heuristic and before Deployment what actions we need to take in APO & R3 1. Level the planned production orders 2. Before the run all the actual stock should be realised in the system ( finished goods stock ) or the run should be after the days production. ( if deployment is only based on free stock then the blocked/quality stock should not be very high or the decision on making it DND or moving it back to free stock should be through if the materials are critical). After Deployment and Before TLB what actions the planner need to take in APO & R3 1. In the variant the data selection period should be changed as it is not a dynamic field. 2. Set the planning start date in the variant. After TLB what steps are required in APO & R3 1. If you have collect change pointer then send the process them. Mainly if the process chains are maintained you can run the process in a continuous fashion. If you don't want to run heuristic job separately you can also try real time deployment. The main criticality of deployment TLB lies in the master data settings. Just to say on masters you can check the following things FOR DEPLOYMENT Pull Horizon Push Horizon Checking Horizon Fare Share rule Push Rule Target stock rule FOR TLB Loading Group Pull in horizon if required- T lane TLB profile TLB General settings - SPRO Ans 2: First release forecast from DP to SNP. Run LC consistency check in SNP Planning Area ( report /SAPAPO/TS_LCM_CONS_CHECK) delete forecast from the past /sapapo/md74 release forecast /sapapo/mc90 Run SNP heuristics /sapapo/snp01 After Heuristic and before Deployment what actions we need to take in APO & R3 1. Level the planned production orders 2. Run Deployment heuristics /sapapo/snp02 if you want to publish and it is not online /sapapo/c5 run CCR /sapapo/ccr generate alerts: DP background jobs After Deployment and Before TLB what actions the planner need to take in APO & R3 1. Analyze alerts (/sapapo/amon1) 2. Analyze Master data 3. Create POs 4. Send to OLTP After TLB what steps are required in APO & R3 1. Run CCR /sapapo/ccr
Get help for your SAP APO problems
SAP Books
SAP APO Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|