"Material
Requirements Planning (MRP) with SAP S/4HANA" is a comprehensive guide
that provides readers with an in-depth understanding of how to use the
MRP functionality in SAP S/4HANA.
MRP is the backbone of manufacturing, so
get the SAP S/4HANA details you need to maximize your system! With this
comprehensive guide, set up master data and configure SAP S/4HANA with
step-by-step instructions. Run classic MRP, MRP Live, or both to plan your
materials; then evaluate your results using either SAP GUI transactions
or the SAP Fiori apps in the MRP cockpit. From order planning and procurement
proposals to stock/requirements lists and rescheduling checks, this book
has your back.
Table of Contents
Introduction to MRP with SAP S/4HANA
MRP Basics
MRP within the Supply Chain in SAP Systems
MRP with SAP S/4HANA
-
Classic MRP
-
MRP Live
-
MRP Cockpit
-
Demand-Driven MRP
-
Predictive Material and Resource Planning
MRP Basics
MRP Procedures
-
Material Requirements Planning
-
Master Production Scheduling
-
Consumption-Based Planning
-
Demand-Driven MRP
The MRP Planning Process
-
Reading the Planning File
-
Calculating the Net Requirements
-
Calculating the Procurement Quantity
-
Determining the Replenishment Proposal Type
-
Scheduling Replenishment Proposals
-
Exploding the BOM
-
Creating Exception Messages
Master Data and Basic Settings
Material Master
-
MRP Type
-
Lot-Sizing Procedures
-
Procurement Types and Special Procurement Types
-
Scheduling Parameters
-
Net Requirements Calculation
-
MRP Area
Procurement Master Data
-
Internal Procurement
-
External Procurement
-
Quota Arrangement
Planning File
Configuring MRP
Overall Plant Parameters
-
Maintain Environment
-
Maintain Master Data
-
Maintain Planned Orders
-
Maintain Planning Run
MRP Group
-
Consumption Mode/Adjustment Horizon
-
Horizons
-
Determine Production Storage Location
-
Convert Planned Order
-
Program Plan: Independent Requirements Split
-
Evaluation
-
Planning Run
-
External Procurement
-
Availability Check
MRP Type
Lot-Sizing Procedure
Availability Check
MRP Areas
Parallel Processing
Running MRP
MRP Live versus Classic MRP
Classic MRP
-
Control Parameters
-
Single-Item/Single-Level Planning
-
Single-Item/Multilevel Planning
-
Single-Item Interactive Planning
-
Multilevel Sales Order/Project Planning
-
Total Planning Run
-
Master Production Scheduling
MRP Live
-
MRP Dispatcher
-
MRP Live Control Parameters
-
Running MRP Live in SAP CUI
-
SAP Fiori
Planning PP/DS Materials in MRP Live (one MRP Run)
Evaluating the MRP Results
Exception Messages
Rescheduling Checks
The Stock/Requirements List
-
Individual Access
-
Collective Access
MRP List
Information and Settings for Materials in MRP on SAP
HANA
Order Report
Pegged Requirements
Evaluation of the Planning Situation
-
MRP Cockpit
-
Shortage
-
Accessing SAP Fiori Applications for MRP
-
Monitor and Manage Material Coverage
-
Monitor and Manage Internal Requirements
-
Monitor and Manage External Requirements
-
Monitor and Manage Production or Process Orders
-
Display MRP Master Data Issues
-
Manage Change Requests
-
Detect MRP Situations
Managing Planned Orders
Planned Orders
Planned Order Availability Check
Planned Order Conversion
Additional Options for Mass Processing
Advanced MRP Features
Subcontracting Planning
Planning Calendar
BOM Explosion Number
Parts Interchangeability
Creating an MPN-MRPSet
Planning an MPN-MRPSet
Range of Coverage Profile (Dynamic Safety Stock)
Demand Management
What Is Demand Management?
Planning Strategies
-
Planning with Final Assembly (Strategy 40)
-
Net Requirements Planning (Strategy 10)
-
Gross Requirements Planning (Strategy 11)
-
Make-to-Order Production (Strategy 20)
-
Planning without Final Assembly (Strategies 50 and 52)
-
Planning with a Planning Material (Strategies 60 and 63)
-
Planning at Assembly Level (Strategies 70, 74, and 59)
-
Assembly-to-Order (Strategies 81 through 86)
Creating a Demand Plan
-
Splitting Independent Requirements
-
PIR Reorganization
Configuring Demand Management
Demand-Driven MRP
What Is DDMRP?
-
Buffer Calculation
-
The DDMRP Process
Setting Up DDMRP
-
Product Classification
-
Mass Maintenance of Products
-
Buffer Proposal Calculation
Running DDMRP
Integrating DDMRP with SAP IBP
Long-Term Planning
Creating a Long-Term Planning Scenario
Running Long-Term Planning
Processing Simulative Planned Orders
Evaluating the LTP Results
-
Evaluating Work Center Capacity
-
Transferring the LTP Results to the Logistics Information
System
Cleaning Up the Long-Term Planning Scenario
Predictive Material and Resource Planning
Prerequisites to Run pMRP
Creating a pMRP Simulation
Processing pMRP Simulations
Releasing the pMRP Simulation
Administering MRP
Housekeeping MRP
-
Keeping the Planning File Consistent
-
Managing Background Jobs
-
Deleting Old MRP
Troubleshooting MRP
-
Material Not Planned
-
Inconsistencies
-
MRP Live Support Functions
Improving MRP Performance
-
Classic MRP
-
MRP Live
-
Frequent Causes and Solutions
Enhancing MRP
Enhancing Classic MRP
Enhancing MRP Live
Enhancing the SAP Fiori Applications of the MRP Cockpit
Migrating to SAP S/4HANA
Performing Readiness Check
Assessing Simplifications in MRP
-
Planning File
-
Storage Location Planning
-
Subcontracting
-
Production Versions
-
External Procurement
-
Total Requirements Cleanup
Reviewing Custom Code
Evaluating New MRP Features
-
MRP Live
-
Demand-Driven MRP
-
Predictive Material and Resource Planning
-
SAP Fiori and the MRP Cockpit
Key Takeaways
After reading "Material
Requirements Planning (MRP) with SAP S/4HANA," readers will gain the
following knowledge:
-
Understanding of MRP
basics and configuration.
-
Ability to run MRP and
evaluate MRP results effectively and efficiently.
-
Knowledge of how to
manage planned orders and use advanced MRP features.
-
Understanding of demand
management and demand-driven MRP.
-
Knowledge of long-term
planning and predictive materials and resource planning.
-
Ability to administer
and enhance MRP.
-
Guide on how to migrate
from SAP ERP to SAP S/4HANA.
Author's background
and qualifications
Caetano Almeida is
a Center of Expertise support architect at SAP. He has over ten years of
experience in manufacturing and supply chain management, with a focus on
production planning and MRP. |
|
|