1. What are the types of special stocks available?
Subcontracting, consignement, pipeline, project, sales
order, RTP, stock transfer ,third party.
2. What are the types of inforecords?
Standard, consignment,subcontracting & pipeline.
3. What is meant by consignment stock?
The stock supplied by the vendor is in the companies
premises with the company having no liability for the same. The liability
for the company will only be affected when the goods are issued from the
consignment stock for use.
4. What are the steps involved in consignment cycle?
Create consignment info record with proper tax code,
create Po with item category K, maintain output condition record for KONS,
process GR, no invoice verification done, but settlement is done through
MRKO transaction.
5. Tell me about the subcontracting cycle.
The Po is created with item category L , the goods is
transferred to subcontractor by 541 movemet. for this movement note no
accounting docs take place. When GR is done automatically, 543 movemnt
takes place which take care of the consumption of components from stock.
6. How are the byproducts taken care of in subcontracting?
You can add these by products in the BOM for the header
matl.
7. What is meant by scales?
Can scales be used in standard purchase order?
You can fix a price in the info record for a say qty from 1-100 price RS150
& if the order qty is 101- 500- the prices is 140 . Scales cannot be
used directly in PO but can be pulled into the PO from various master data
like info record, quota arrangement.
8. What is the difference between a contract and a
scheduling agreement?
With regard to Outline Agreement:
1. You can create the centrally contract (cross-plant)
where you can maintain different pricing conditions for each and every
plant
2. You have to create the Release Order with reference
to Outline Agreement.
3. No detailed delivery schedule can be made in the Release
Order.
4. No Release documentation is created.
5. Only time-dependent conditions can be created.
6. Some Item Category 'M' and 'W' can be used.
With regard to Scheduling Agreement:
1. The Plant Location must be entered in the Scheduling
Agreement.
2. We do not have to create any other purchasing document
except for delivery schedule line via Transaction ME38 or MRP running (with
the appropriate setting of Source List).
3. Delivery Schedule line items are created subject to
your specific requirement.
4. Can create both Scheduling Agreement with and without
Release Documentation (subject to the Document Type LP or LPA) with the
selection of either FRC or JIT delivery schedule.
5. Either time-dependent or time-independent conditions
can be created subject to the customizing in the Document Type of the Scheduling
Agreement.
6. Item Category 'M' and 'W' can not be used.
9. How does the system calculate taxes?
10. How does the system calculate nondeductible taxes?
11. What is meant by batches? How can the batches be
searched?
A batch is a subdivision of your stock of a material
having the same characteristics.
For instance:
- food production uses batches to indicate the day of
production.
- paint production uses batches based on production date
and the used ingredients. It is very hard to reproduce the same color in
exactly the same way at two different moments.
- ore may be divided in batches based on their mineral
content.
You can search batches using the standard search facility
(match code, key F4) based on the naming convention of the batches or,
if you use batch classification, based on the characteristics of the batches.
12. How is a shelf-life item managed in SAP? What is
the full cycle?
13. What are the settings required for quota arrangement?
To set up a quota arrangement for the procurement of
a material, proceed as follows:
Master data -> Quota arrangement -> Maintain, enter the
material and plant number, press ENTER to display the overview screen
for the quota arrangement periods, Enter a validity period for quota arrangement,
Enter date until which the quota arrangement is valid. The start date is
calculated by the system. Press ENTER .
Select the quota arrangement and choose Goto -> Item
overview to display the item overview screen of the quota arrangement.
Enter a quota arrangement item for each source of supply you want to include
in the quota arrangement.
You must enter the following data.
- Procurement type
- Special procurement type, Enter k in the S column,
for example, if a consignment arrangement for the material exists with
the vendor.
- Vendor number
- Procurement plant (supplying plant):
- Quota column, enter the quota assigned to each item.
Press ENTER .
The percentage distribution of the quotas is calculated
and displayed automatically by the system.
Save the quota arrangement. The system assigns
a number to the quota arrangement item automatically
14. What is meant by MRP Type and lot sizing?
15. Can it be configured in such a way that the external
requisitions can also be taken into account while MRP runs in consumption-based
planning if VB is selected as MRP type?
16. How are free items managed in a PO? yu need to
tick the tem as free in the PO. The price will be zero for such PO's.
17. What are the differences between release procedure
with classification and release procedure without classification? When
are they used?
Release procedure with classification means the Purchase
requsition can be released both at item level & at the header
level. Release procedure with out classification can also be used for PR
which is used for item level release only. all other external
documents cannot be relesed with classification. The two procedures
are mutually exclusive (that is to say, you must decide in favor of one
of them only - you cannot use both).
18. Is it possible to have a release procedure without
classification for a PO?
No
19. What is the maximum number of levels available
in SAP?
Did not get this question …pls clarify.
20. Is it possible to have scales in a quotation?
No
21. What is GR blocked stock? When it can be used?
Whenever you are not sure about the quality of the product
received, you can put in GR blocked stock.
22. How are the variations in subcontracting taken
care of in SAP?
23. How to give specifications for developments?
We normally prepare a business requirement document in
which we specify what is required. what field & tables have to be referred
for the required development.
24. How to create PR or PO by MRP?
The PR is created according to the safety stock
mentioned for the material or can be triggered from a requirement . For
creating a PO, you need to have the scheduling agreement in place .After
the MRP is run the schedule lines are generated which are nothing but the
PO. |