Subcontracting - Key Points
Special Procurement Process. Item category: L
In info record vendor should be maintained as subcontractor. Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party. Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists). Stock check at vendor level: ME2O Company stock check: MMBE GR for individual components through movement type: 501 or 561 (if with out PO or without reference). GI to subcontracting vendor: through movement type 541. GR from sub contracting vendor: through movement type:
101
If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen. SAP MM Tips by :
Sundaramoorthi
Editor Note:
- To create Material BOM : Tcode CS01 - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
Fast links:
SAP MM Books
SAP Material Management Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|