Control Maintenance Budget in
PM
The way to control maintenance
budget in PM.
by : Santosh Satapathy
Maintenance budget
1) Hi, I just see some desperate
attempt to know about maintenace budget and control but I hope can clear
you all. Budget and control of order can be done to all the order
type of sap pm orders functional background
As we know when creating equipment
in maintenance master data we are using two work centeres one is location
work center and the other one is responsibile work center. The location
work center describes the line or area or section of production the equipment
belongs and in the order the work center we maintain it maintains the cost
per activity we define.
Suppose our maintenance team goes
and do some work, say for two hours, so for this activity type what is
defined in the controlling will be debited from the production line or
section or area as it is maintained in pp. Of cousre when we settle
the order and at the same time from the budget that much of fund deducted
Integration Part
a) actually this is done by co
people
b) go to trans koab
c) tick the commit management in
control indicators
maintain co-partner
as semi active
you can maintain
other things as maintaenance status and settlement profile
d) you should maintain object class
as overhead costs orif you have service module you can do profitably analysis
e) you must maintain collective
order without automatic goods movement
f) you can maintain status profile
as your wish
g) for residence time i amintaied
one month
2) then you have to maintain budget
profile
for maintaining
budget profile you have to goto trs ok0b
crate a budhet
profile these are co people job
3) go to oioa here you assign budget
profile to order type
4) in mantain budget profile
time frame
-past means how many years past you can plan here start year is the
referenace point
same with
future
you must
tick total values
annual
values
exchange
rate should be m-standard translation at average rate
activation
type should be 1-automaticactivated when budget allocation done
budgeting
currency-i choose controlling currency
5) then go to ko22 and assign the
budget profile to order or group of order
This is the way I maintain budget
for pm orders.
Have a SAP PM Problems?
SAP
PM Forum - Do you have a SAP PM Question?
SAP Plant Maintenance Books
SAP PM
Books - Certification, Interview Questions and Configuration
SAP PM
SAP PM Tips and
Plant Maintenance Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|