Question:
I have created a Purchase Requisition through a Maintenance Order by using Non-stock item category. Later, I decided that I don’t want that material for that work. So I ticked on Clear Reservation at the time of Confirmation in IW42. When I tried to Tech the Maintenance Order, I am getting the following error message: “Final issue for the reservation item 0001 is not completed, TECO not possible Message no. ME303” How can I do Tech without the need of that material? I won’t create a PO normally if I do Clear Reservation at the time of confirmation. Automatically, the system will delete the PR. It’s happening in IDES. It didn’t happen in Production server (ECC 5.0) though. How can I do Tech without the need of that material? --- Answer It sounds very much like a User Exit (Enhancement) may be active in your system. The TECO User Exit to consider is: IWO10004. Use Transaction CMOD so you can see if there is such an exit possible. Drop down on the project field to search for a project associated with indicated exit. Search by “Information System” and at the bottom of the selection screen there is an Icon called “All Selections” [Shows a little + sign too]. Now once you have expanded the selection criteria insert the indicated User Exit Number in the “Enhancement” field. Execute and wait to see if there is a project associated with the exit at TECO. If there is one, select it and select the DISPLAY ICON. Once the data is shown there is a “Project Status”. If this is “Active”, then you have an active exit on TECO. I suggest you have an ABAPer look at the code associated in the “Include” of the exit. I suspect there is code checking a flag on the Materials or something. |
|
Have a SAP PM Problems?
SAP Books
SAP PM
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|