Explode BOM
Transaction code :
CS11 to explode BOM
level by level
CS12 to explode BOM
Multi level
Material : Your Material code
Plant : Your
Plant
Alternative BOM : if you have multiple BOMs
BOM application : PP01 if you follows SAP default
for Production General
Valid from : date of BOM you want to change
Required qty : enter required quantity (optional)
SAP PP Books
SAP Production
Planning and Control Certification, Interview Questions and Configuration
Reference Books
SAP PP Tips
SAP PP Tips and Production
Planning/Control
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|