Answers for SAP PP Certification
Sample Questions
Question:
The following control parameters can be set in a long-term
planning scenario :
Answer:
A
Planning period
B Opening stock
C Strategy group
D MRP type
E Version
of available capacity
Question:
What is the name of the planning level for the MRP
run?
Answer:
A. SOP
B. MP
C. MRP
D. COPA
Question:
What are the main features of the MRP types 'PD' or
'VB'?
Answer:
A. 'PD' can only be used with 'Net Change Planning'
B. 'VM' can only be used in total planning
C. 'PD' triggers a BOM
explosion
D. 'VM' can use the forecast
for the calculation of the safety stock
Question:
What is the meaning of the planning time fence?
Answer:
A. It determines the planning period for the planning
run
B. It determines the period in which the planned
orders are to be converted into production orders
C. It determines the period
in which no automatic changes are to be made to the production plan
Question:
In forecast-based planning, which forecast model does
SAP support?
Answer:
A. dynamic model
B. seasonal trend model
C. split trend model
D. Consumption model
Question:
What conditions must be fulfilled in Customizing if
a production order is to be checked for availability?
Answer:
A. Scope of check
B. Checking group
C. checking rule
D. Checking assignment
E. Inspection period
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|