1) Where does SAP
S/4HANA store the low-level code used to determine the sequence in
which materials are planned during the MRP run?
Note: There are 2 correct answers to this question. A. Production version
Which is the correct answer? --- 2) Your MRP run detects a shortage
of 2000 pieces for a material with an active quota arrangement. Each
of your two suppliers can only supply 1000 pieces at once. What must you
maintain to have MRP generate a procurement proposal for 1000 pieces for
each supplier?
A. Assign a rounding profile in
the material master record of the planned material.
Which is the correct answer? --- 3) What are the prerequisites for
carrying out material requirements planning (MRP) for a plant?
A. Assign each storage location
of the corresponding plant to an MRP area in Customizing.
Which is the correct answer? --- 4) Which of the following procurement
proposals can be created during an MRP Live planning run for externally
procured materials?
A. Planned order
Which is the correct answer? --- Answers: 1) B, C 2) C, D 3) B, D 4) C, D
|
|