Planned Order Conversion to Process Orders

We are facing problems when converting planned orders to process orders. During conversion when BOM is re-exploded it is not using the same production version as specified in the planned order instead it defaults to the first one it sees. 

I need to know if I am missing any settings anywhere..... 

First ensure that setting in the material master for BOM explosion is "Selection thru prod version".

Then Pls check the validity periods of the new production version.

e.g
Prod Ver Val frm     val to     No lot size variation
0001     01.01.2007  31.12.9999
0002     01.01.2007  31.01.2007
or
0001     01.01.2007  31.12.9999
0002     01.01.2007  31.12.2007

Then in both the cases system will always pick prod ver 0001 default (Longer validity period).  If not the case then 
Check for lot size variation (if lot size dependent.)

Further if you are not able to select the req prod Ver then you can lock the earlier prod version(if it is not in use). 

To avoid this prob in future.... always use "Valid to date" either in limits (31.12.2007) or without limit (31.12.9999) for all prod version of a material.

When we have to go for Planned order conversion to Process order, it is used in manufacturing industry or process industry, when exactly we use process orders?

It is used for process industries.                            *-- Pradeep

Assign Multi PR
Assign Multiple Planned Order to a Purchase Requistion

Get help for your SAP PP Problems
SAP PP Forum - Do you have a SAP PP Question?

SAP Production Planning Books
SAP PP Books - Certification, Interview Questions and Configuration

SAP PP Tips
SAP PP Tips and Production Planning/Control Discussion Forum

Main Index
SAP Basis, ABAP Programming and Other IMG Stuff

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.