Planned Order To Production Order Conversion

How to restrict the conversion of planned order to production order when material does not have BOM?

Suggestion 1:

Yes, it is possible through availability check, in OPJK in checking control at the time of production order creation, set no creation of order if materials are missing in collective conversion. Your problem will be solved.

Or use enhancement PPCO0012
 

Suggestion 2:

In T-code OPJK

In business transaction 1, you will get collective conversion -

in here you need to select no creation if materials missing.

This option controls whether a planned order can be converted to a production order if one or more material components are not available.
 

Suggestion 3:

In case of BOM missing you can stop the Conversion of Plan order to Production order by 2 ways.

1) During the Planned order to Production order / Conversion system consider the attached Routing/Recipe and BOM to the production version and include them to the order. So if during this conversion system doesn't find BOM then it will saw below Massage

No suitable BOM alternative could be determined

Message no. CO398 

You can change this massage to error massage.

2) By using user Exit,

PPCO0006 Enhancement to predefine fields in order header

PPCO0021 Enhancement for Order Release

PPCO0007 Exit when saving production order
 

Suggestion 4:

You can solved this by making the component field mandatory in tcode "SHD0".

SAP PP Tips

See also
Difference Between Basic and Lead Time Scheduling

Get help for your SAP PP Problems
SAP PP Forum - Do you have a SAP PP Question?

SAP Production Planning Books
SAP PP Certification, Interview Questions and Configuration Books

SAP PP Tips
SAP PP Tips and Production Planning/Control Discussion Forum

Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.