Production Order Inspection Lot

When creating the production order, inspection lot do not create.
What are the steps for configuration setting?

QM view had been maintained and insp. setup and have also maintained OPL8 inspection type In-Process Insp. for Production Order(03).

Answer:

The following are the steps for setting up production order inspection lot.

1) Create FG material : MATQM_RR : MM01

2) Create RAW materials : QMR1_RR & QMR2_RR : MM01
CHECK : CLASSIFICATION VIEW
BATCH MANAGEMNET

3) Create BOM : CS01

4) Create ROUTING : CA01
Assign the control key which has inspection 
Characteristics REQ. ( EX : PP06)
During the creation, there might be an error saying: 
THE INSPECTION Characteristics REQ.

5) Create Characteristics : CT04
THICK_RR : ( THICKNESS IN MM FOR THE RANGE 15~20)
HARD_RR : ( HARDNESS IN % FOR THE RANGE 16~ 20)

6) Create CLASS : CL02
QMCLS_RR
Assign the Characteristics : HARD_RR & THICK_RR

7) GO TO MM02 : ASSIGN THE QMCLS_RR FOR FG & R1& R2
Assign the CLASS (QMCLS_RR) to all the materials.

8) Create MASTER INSPECTION Characteristics : QS21
Create MASTER INSPECTION CHAR FOR BOTH : HARD_RR & THICK_RR

9) Create A QUALITY WORK CENTER : WQM
Make the usage : 002 (ONLY INSPECTION PLANS)
Select the control key as : QM01

10) Create INSPECTION PLAN : QP01
For FG MATERIAL : Usage=5, ASSIGN THE INSPEC. CHARS

11) Create INSPECTION PLAN : QP01
For QMR1_RR MATERIAL : Usage =5, ASSIGN THE INSPEC. CHARS
For QMR1_RR MATERIAL : Usage =6, ASSIGN THE INSPEC. CHARS

11) Create INSPECTION PLAN : QP01
For QMR2_RR MATERIAL : Usage =5, ASSIGN THE INSPEC. CHARS
For QMR2_RR MATERIAL : Usage =6, ASSIGN THE INSPEC. CHARS

12) FOR IN PROCESS INSPECTION TO GET ACTCIVATED : CA02
Assign the inspection Characteristics in the routing.
CHECK FOR ERRORS & THEN SAVE

13) Create PURCHASE ORDER FOR THE RAW MATERIALS : ME21N
Create for both QMR1_RR & QMR2_RR

14) RELEASE THE PURCHASE ORDER : ME28

15) GOODS RECEIPT : MIGO ( AGAINST THE PO)
System has to create the batches for the materials.

16) GO TO INSPECTION LOT : QA32
Look for the created batches of the Res, Materials
Record the results
Save the recorded results
Usage Decision

17) Create A PRODUCTION ORDER FOR THE HEADER
Create & Release

18) DO THE GOODS ISSUE TO THE PRODUCTION ORDER (MIGO)

19) DURING THE GOODS ISSUE , AGAIN ONE INSPECTION LOT MIGHT HAVE GENERATED

20) AGAIN TO INSPECTION LOT : QA32
Record the results
Save the recorded results
Usage Decision

21) DO THE CONFIRMATION OF PRODUCTION ORDER : CO15 / CO11N

22) ONCE CONFIRMATION IS DONE, DO THE MIGO : GOODS RECEIPT

23) DURING THE GOODS RECEIPT ALSO, AGAIN INSPECTION LOT GETS GENERATED

24) AGAIN GOTO INSPECTION LOT : QA32
Record the results
Save the recorded results
Usage Decision

25) Now check the stocks.

SAP PP Tips

Get help for your SAP PP Problems
SAP PP Forum - Do you have a SAP PP Question?

SAP Production Planning Books
SAP PP Certification, Interview Questions and Configuration Books

SAP PP Tips
SAP PP Tips and Production Planning/Control Discussion Forum

Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.