When creating the production order, inspection lot
do not create.
What are the steps for configuration setting? QM view had been maintained and insp. setup and have also maintained OPL8 inspection type In-Process Insp. for Production Order(03). Answer: The following are the steps for setting up production order inspection lot. 1) Create FG material : MATQM_RR : MM01 2) Create RAW materials : QMR1_RR & QMR2_RR : MM01
3) Create BOM : CS01 4) Create ROUTING : CA01
5) Create Characteristics : CT04
6) Create CLASS : CL02
7) GO TO MM02 : ASSIGN
THE QMCLS_RR FOR FG & R1& R2
8) Create MASTER INSPECTION Characteristics : QS21
9) Create A QUALITY WORK CENTER : WQM
10) Create INSPECTION PLAN : QP01
11) Create INSPECTION PLAN : QP01
11) Create INSPECTION PLAN : QP01
12) FOR IN PROCESS INSPECTION TO GET ACTCIVATED : CA02
13) Create PURCHASE ORDER FOR THE RAW MATERIALS : ME21N
14) RELEASE THE PURCHASE ORDER : ME28 15) GOODS RECEIPT : MIGO (
AGAINST THE PO)
16) GO TO INSPECTION LOT : QA32
17) Create A PRODUCTION ORDER FOR THE HEADER
18) DO THE GOODS ISSUE TO THE PRODUCTION ORDER (MIGO) 19) DURING THE GOODS ISSUE , AGAIN ONE INSPECTION LOT MIGHT HAVE GENERATED 20) AGAIN TO INSPECTION LOT : QA32
21) DO THE CONFIRMATION OF PRODUCTION ORDER : CO15 / CO11N 22) ONCE CONFIRMATION IS DONE, DO THE MIGO : GOODS RECEIPT 23) DURING THE GOODS RECEIPT ALSO, AGAIN INSPECTION LOT GETS GENERATED 24) AGAIN GOTO INSPECTION LOT : QA32
25) Now check the stocks. |
|