How to map the scenario for Production order confirmation, Rework order create automatic with help of trigger points? By: Faisal First check in Tcode OPJF for the selection id a Priority is defined for the Task list type S with usage 1 and status 4 and then Proceed as follows: 1. Create a Reference op set in tcode Ca11.
2. Create a Standard trigger point in CO31.(Ex Production)
3. Tick the Trigger Point Functions. 4. Enable the indicator create order with Reference. 5. Enter the system status as PCNF. 6. Enter change as +. 7. Enable the indicator once. 8 . Now place the cursor on the create order with reference. 9. Goto Parameters. 10. In the Parameter enter in the group the created Reference op set group no. 11. Order type as PP01 and group counter as 1 and save the Trigger Point. 12. Now goto the Routing for your Material. 13. Choose the last op to assign the Trigger point. 14. Select the OP ----> Goto ---> Trigger Point overview. 15. Enter the Trigger Point usage as FERT. 16. Now choose that line ,select the Details---> Trigger Point 17. The system will says standard trigger point exists from which you can select the created Trigger Point (EXx Production)and save. 18. MD02/MD04. 19. Convert the Planned Order into Production Order and Release the order. 20. Now confirm th ops. 21. For the last op enter the yield and rework qty and set the status as PCNF. 22. If the status of last op is PCNF then in the system a POP UP will appear as Activited by Trigger Point /Create order with reference/order number/sequence and op number which trigger point works and enter.
Get help for your SAP PP Problems
SAP Production Planning Books
SAP PP Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|