What is engineering change management?
The Engineering Change Management (ECM) is used to track and control all the changes with reference to Material master, BOM, Work Center & Routing. The first step you need to do is to create a Change master thru CC01 T-code. The system will give you one change number. Using this number you can change all the masters record. By default, you need to activate the change number, thru ABAP program, you need to activate this field as a mandatory. Through authorisation we can control the access. The following are SAP ECM transaction code activities in Engineering Change Management. Change number CC01 - Create change number CC02 - Change change number CC03 - Display change number Object management record CC22 - Change object management record CC23 - Display object management record Engineering Change Management for production orders COCM - Change order process u2013 source item Revision level CC11 - Create revision level for material CC12 - Change revision level for material CC13 - Display revision level for material CC15 - Change revision level for document CC16 - Display revision level for document Reporting CS80 - Material BOM change document CV80 - Document BOM change document CS82 - Order BOM change document CC05 - Change overview CC60 - Change hierarchy CJ00 - Find digital signatures Configuration Management CMWO - Configuration Management workbench Undo Changes CCUNDO - Undo changes with Engineering Change Management (Available from SAP ECC 6.0) |
|
See also
Get help for your SAP PP Problems
SAP Production Planning Books
SAP PP Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|