List of questions to test your
knowledge of the production planning module master data maintenance.
1) The standard R/3 System contains the following item categories: A. Item Categories for Material Items
2) You can use the following item categories for material items: A. Stock Items
3) In the standard R/3 System, material type INTR is defined for intra materials. The views you maintain for this material type include: A. Basic data
4) The basic data is divided into the following datasets: A. Identifying BOM Items
5) The following data is maintained under general data: A. Co-product
6) Before you maintain alternative items, decide the following points for MRP and withdrawal postings: A. Do you want to assign the same item number to all alternative
items in an alternative item group?
7) You display and enter the data for discontinuation in a dialog box. A. Discontinuation indicator
8) You can maintain the following material requirements planning (MRP) data for a BOM item: A. Entering a Lead-Time Offset
9) The following application areas read the lead-time offset for an operation: A. Maintenance orders
10) You can assign a document to a BOM header or item.
On the header detail screen and the item detail screen of each item there
is a tab page with a list of the assigned documents.
A. Assign documents
--- Correct Answers 1) A, B, C, D 2) A, B, C, D 3) A, B, C 4) C, D, E 5) A, B, C, D 6) B, C, D 7) A, B, C 8) A, B, D 9) A, B, C 10) A, C, D, G |
|
Fast Links:
Do you have a SAP PP Question? SAP Books
SAP PP Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|