Steps for Subcontracting
Like to share with you my Subcontracting Steps: 1. Define all the materials in your plant (subcontracting and packaging etc). 2. In the material master MRP 4 view there is one field in which you can mention that this material is not relevant to MRP planning, use this field for subcontracting material so that it will not be planned in MRP runs ( generally use this field for re-order point planning). 3. In the BOM for the subcontracting material put the special procurement key as Subcontracting and do not keep relevance for costing. 4. If you're using packaging material of your company and want to capture the cost of these materials in the subcontracting production order then put relevance for cost. 5. Define alternate BOMs for each customer. 6. Generally the routing will be the same but materials will change, define different prodcution versions for each alternate BOM and assign to the routing. 7. Define the activite types for packing and mixing in the work center and assign them to the cost center, use these for your routing. 8. Whenever you recive a sub-contracting order, use the relevant production version depending on the customer. In my place all the palnts belong to the same client in sap and they want to use the same material code in both plants, so I think my subcontracting scenario might be different from yours but it give you some ideas to go about it. SAP PP Tips by : Sandeep Note: To Define Subcontracting Cost Center : Goto - ca02 - double click operation number. It is at the section call External Processing. (Subcontracting will be tick).
Get help for your SAP PP Problems
SAP PP Books
SAP Production Planning Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|