Steps To Do Repetative Manufacturing
By : Baskaran Repetative manufacturing is period based planning and not based on orders. Normally same products will be manufactured over longer period of time..products will not change frequently. Confirmation is from backflushing and settlement is through from product cost collector for the period. Confirmaton will be without ref to planned orders. Planned orders are sufficient to carry out shop floor activity. In master data production versions and cost collector is must where this is not mandatory in discreate. You do these steps for rem production: mm01 : Material Master
cs01 : Create Bom cr01 : Create Work Center ca21 : Create Rate Routing mm02 : Prodn Version md61 : Create PIR mc74 : Transfer PIR to Demand kkf6n : Create Product Cost Collector mb1c : Create Stock md02 : MRP run mfbf : Rem Back Flush The detailed sequence of T.Codes for REM including Std cost estimate. Material master - MM01 BOM - CS01 Price Planning - KP26 Work Center - CR01 Rate Routing - CA21 Material Master Change, enter production version - MM02 (MRP 4 View) Product Cost Collector - KKF6N Costing - CK40N Backflushing - MFBF
Get help for your SAP PP Problems
SAP Production Planning Books
SAP PP Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|