What The Use of Reorder Planning
What the use of reorder planning? How to create reorder
planning?
By : Supriyo Sengupta
Reorder planning, when plant stock falls below reorder
point procurement is triggered. Planning can be done by manual
or automatic. We maintain reorder point in Material Master
when warehouse stock reaches this level, MRP will trigger procurement for
the same.
AND reorder point planning is used for consumption based
planning.
For re-order point planning, you have to put some field
in MRP1 View of the Materail Master.
MRP Type: VB (manual reorder point planning)
Reorder Point: for example 100 ( the level of stock at
which u want to trigger replenishment)
Lot Size: HB (maximum replenishment) / or u can maintain
EX / FX also. but it advisable to go with HB
Maximum Stock Level: for example 400 (as per ur requirement)
For re-order point planning, you can leave blank strategy.
Get help for your SAP PP Problems
SAP PP Forum
- Do you have a SAP PP Question?
SAP Production Planning Books
SAP PP
Certification, Interview Questions and Configuration Books
SAP PP Tips
SAP PP Tips and
Production Planning/Control Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.erpgreat.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.erpgreat.com or the content authors.
|