Ticket:
The requirement of our client is that the WIP is to be calculated such that it is the actual cost till date + a fixed percentage on actual cost till date. In this case the fixed percentage is 7.5%. The client also had a different requirement whereby the WIP was = (Actual Cost/Estimated Cost)*Project Value. This we have been able to achieve by making the required settings in transaction OKG3. However, we are unable to get the WIP as actual cost + a percentage on actual cost. What are the required settings to be done in this case? Answer: The config. for WIP calculation can be done through Result Analysis. Please maintain a different RA key for Cost Plus WIP. After that define the valuation method for this key (OKG3). In this make the following settings: IMG Path -> Project System -> Revenue and Earnings -> Automatic and Periodic Allocations -> Edit Result and Analysis Keys and Version -> Define Valuations Methods for Result Analysis RA Type E
This will take care of the COST plus billing as per your requirement. |
|
See Also
Get help for your SAP PS problems
SAP Project System Books
SAP Project System Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|