What is the steps to copy the inspection plan? Here are the steps to copy inspection plan: 1. Run QP01. 2. Enter Material and plant. 3. Now press F5 or click on the tab to copy inspection plan. 4. In the next appearing window enter Group number which you want to be copied or enter material from you want to copy the Inspection details. And go ahead. 5. The entire tasklist will get copied now make the necessary changes if ther any & save. NOTE. The material/vendor assignment details will also
get copied, which will required to be deleted as per the requiement.
Explan the meaning of inspection plan and lot? Inspection plan is combination of material , Plant and group an we can use plan, for instance, to identify two routings that have different production steps for one material. Inspection lot is combination of Material ,Plant and origin Describes what causes an inspection lot to be created. Example: An inspection lot can originate: - from a goods receipt
Have a SAP QM Problems?
SAP QM Books
SAP QM Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|