Following are the multiple steps
for the integration (you can add steps based on your company needs).
The steps for PP-PI QM Integration: 1. Material Master is created 2. QM view is created. 3. All the relevant inspection types are assigned. 4. BOM, Resource are created. 5. Now Assign inspection types 03 & 04. 6. Do In Process (inspection type = 03) & FG inspection (inspection type04) to be done 7. Now For - 03 inspection you need to assign inspection characteristics to the Master Recipe. - For the 04 inspection you need to create an inspection plan and assign the control for lot creation in the material master i.e. to X - If you use the Y setting then the inspection lot is created with the release of the order. 8. Final step In the SAP PP-PI scenario the control recipe will generate after you release the process order. You can find point the red round sign on the process order main screen. - Click to activate that sign == the control recipe
is generated.
Note In material master under Quality view, QM config would assign inspection type (one for pre despatch and another one for post despatch). Material Master Table MARA. Check also Material Master Views for increased visibility. Config Activity (that is carried out here) In material master - go to quality management view
Implying when you do PGR (Post Goods Receipt) for return stock material, - it will create a inspection lot.
MM-SD - Under Inventory Management Return Delivery & Credit Memo (issue) Integration Points Module - Increases Inventory - MM QM (For Inspection) Delivery & Goods Issue - Availability Check - SAP
MM
|
|
Also read
Have a SAP QM Problems?
SAP QM Books
SAP QM Tips
Main Index
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|