What is MMR (Material Master Record)?

MMR is a data record containing all the basic information required to manage a material.

It's a master record maintained in the system that contains all the specific data relevant to a material.

Number Assignment:

MMR can have either internal or external number range assigned as per the configuration done at the time of implementation.

Material type:

Materials which have similar characteristics are grouped under the same material type.

Material type controls

1. Number range

2. Screen sequence

3. User departments/ views

4. Type of procurement

5. Internal or external number assignment

Material valuation:

- Standard price procedure - price control is "S"

- Moving average procedure - price control is "V"

1) Transaction codes used with MMR are as follows:

a. Change MMR - MM02

b. Display MMR- MM03

c. Materials List - MM60

d. Schedule changes - MM14

e. Display changes -- MM04

f. Change material type - MMAM

g. Mass maintenance - MM17

h. Flag for deletion - MM06

i.  Maintain storage locations - MMSC

j.  Extend Material views - MM50
 

2) Example of a step by step to create Material master record.

Internal number assignment is considered here.

Key in Transaction code MM01 in the command field.

Select Industry sector is Mechanical Engineering and material type is Raw Material ROH

Press Enter

Select views

Basic data 1

Basic data 2

Purchasing

General Plant data

Accounting 1

Click on check symbol or press Enter

Key in plant and storage location codes in the populated screen then press Enter.

Enter description of the material (e.g. Ball bearing with specification), base unit of measure, material group

Press enter, basic material is e.g. steel 

We are maintaining the mandatory fields first then additional fields.

In purchasing view select purchasing group "001".

Press enter and in the next screen of accounting view 1 enter Valuation Class as e.g. 3000 and any standard price then on saving it MMR is generated.

New Material is now created in the given Plant.

SAP MM Tips

See also

Get help for your SAP MM problems
SAP MM Forums - Do you have a SAP MM Question?

SAP MM Books
SAP Material Management Certification, Interview and Configuration Reference Books

SAP Material Management Tips
SAP MM Configuration Tips and Materials Management Discussion Forum

Main Index
SAP ERP Modules, Basis, ABAP and Other IMG Stuff

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.