Creating Multiple Materials in Material Determination

Material Determination is used to swap one material for another.It is possible to get a list of materials for substituiton,but remember you can substitue only one material from the list.

This can be done through substituiton reason T Code [OVRQ]
See the substitution reason number for Manual Material Selection
- check the Entry box
- check the Warning box
- select A for Stategy
- save.

Go To VB11 to create Material Determination (taking into consideration that all the previous steps for material determiantion i.e. maintaining condition types,maintaining procedures for material determination and assigning procedures to sales doc. types have been done)

Create one material determination,dont forget to give the Subst reason on top and also on the line.

Click the Variants Icon on top left-Sreen opens

Specify different materials you want to swap with the material you have enterd

Note that the subst reason is already copied on the screen

Remember materials should be of the same sales area,atleast Divisions should be same.

SAP SD Tips by : Rajarshi Banerjee

Fast Links:
Implementing the Sales BOM
Sales BOM Implementation

Get help for your SAP SD problems
Do you have a SAP SD Question?

SAP SD Books
SAP Sales and Distribution, Certification, Interview Questions Reference Books

Delivery Hints
SAP Logistics Execution

SAP Sales and Distribution Tips
SAP SD Discussion Forum and Sales/Distribution Tips

Main Index
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.erpgreat.com

All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies.  The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
 The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.