What Is BOM Referring to SAP
SD
What is bill of material? By: Mike BILL OF MATERIALS We need to maintain Material master records for the BOM Item and for the components also. The item category group of the BOM items is ‘ERLA/LUMF’ and the item category is ‘NORM’. Creating BOM item:
Specify the data for the following fields. Material: Specify the material for which components are to be maintained. Plant: Specify the plant of BOM item.
Alternative BOM: Specifies the sequence of a BOM within
a group of BOMs.
In the overview screen specify the components which makes
the main item and the corresponding quantities and save it.
1) For the BOM to be exploded in the sales document the following customizing setting is required. A) If the item category group is ERLA the item category
of the BOM is TAQ, in the definition of which we have to specify the value
A (Explode single level BOM) in the structure scope.
2) If the item category group is LUMF the system shows price for the components but not for the BOM item. For this the following customizing setting is required. A) The item category of the BOM item is TAP which is not
relevant for pricing, so the BOM item is not Priced.
3) If the item category group is ERLA the system shows price for the BOM item but not for components. For this following customizing setting is required. A) The item category of BOM item is TAQ, which is relevant
for pricing, so the BOM is priced.
While creating sales document to get the list of alternative BOMs in the definition item category of BOM item we have to check the field “Manual Alternative” 24-07-2007 ITEM CATEGORY DETERMINATION FOR BOM ITEM SD type ITCaGr Usg HLItCa DftItCa OR
ERLA
TAQ
NOTE: A – Explode
single level BOM item
Statistical value ‘x’ or ‘y’
Get help for your SAP SD problems
SAP Sales and Distribution Books
SAP Sales and Distribution Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|