What Is Planned and Unplanned
Consumption
Define what is planned and unplanned consumption?
Unplanned consumption is updated only for materials planned using MRP. This occurs in the following cases: 1) If goods are withdrawn from the warehouse without a
reservation.
Planned consumption is not displayed in the material master
record. However, you can calculate it yourself by subtracting unplanned
consumption from total consumption.
Material requirements planning is carried out using current and future sales figures. Consumption-Based Planning uses past consumption data to calculate future requirements with the help of the material forecast or statistical planning procedures. The consumption based planning means: If you are planning your Raw Material not by MRP run, then use Consumption based planning with reorder point. For this the MRP type is VB. The system will not generate PR during MRP run. When ever you issue a RM the system will look for reorder point and if the stock is less than this it will run in planning file entry. The system will raise PR at that point of time only. In which Tables can I find:
1. Consumption of material: MARC-VMORD
2. Stock of material: MARD Table
Max stock MARC-MABST
Related
SAP PP Forum - Do you have a SAP PP Question? SAP Production Planning Books
SAP PP Tips
Best regards,
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.
|